污水處理設(shè)備 污泥處理設(shè)備 水處理過濾器 軟化水設(shè)備/除鹽設(shè)備 純凈水設(shè)備 消毒設(shè)備|加藥設(shè)備 供水/儲(chǔ)水/集水/排水/輔助 水處理膜 過濾器濾芯 水處理濾料 水處理劑 水處理填料 其它水處理設(shè)備
東莞市大田塑膠機(jī)械廠
參 考 價(jià) | 面議 |
產(chǎn)品型號(hào)150T
品 牌
廠商性質(zhì)經(jīng)銷商
所 在 地
聯(lián)系方式:曹鏡森查看聯(lián)系方式
更新時(shí)間:2024-10-14 08:31:04瀏覽次數(shù):47次
聯(lián)系我時(shí),請(qǐng)告知來自 環(huán)保在線150噸液壓打包機(jī)主要適用于廢紙、塑料、鐵屑、垃圾等松散物料的壓縮包裝,減少體積便于包裝、運(yùn)輸以及減少儲(chǔ)放空間。150噸液壓打包機(jī)其具有結(jié)構(gòu)緊揍,結(jié)實(shí)牢固;經(jīng)濟(jì)實(shí)用、操作簡(jiǎn)便、安全可靠等特點(diǎn),是物料包裝、廢舊回收等行業(yè)致富的理想設(shè)備。
150噸立式液壓打包機(jī)
配用動(dòng)力:15KW,
臺(tái)時(shí)產(chǎn)量:3-5個(gè)包塊,
包重:200-800KG,
油缸:Φ160*2支,
150噸立式雙缸設(shè)計(jì)
型號(hào):150
公稱壓力主缸KN:1500
液體*大工作壓力MPa:18
料箱尺寸長(zhǎng)1100mm,寬700mm,高:1400mm
包塊尺寸:長(zhǎng)1100mm*寬:700 *高:(1000)mm
包塊密度kg/m3:≥1000
單次循環(huán)時(shí)間S:45
電機(jī)功率KW:15
油缸行程:1200MM
機(jī)器外形尺寸mm:長(zhǎng)1700*寬1400*高3900。
整機(jī)重量kg;5500.
150噸液壓打包機(jī)使用說明:
本廠150噸液壓打包機(jī)使用68#液壓油,連接電源三相380V,額定電流為25A,安裝時(shí)要有接地保護(hù),電機(jī)要根據(jù)所示方向運(yùn)轉(zhuǎn)才能啟用,否則不能啟動(dòng)。油箱加入120公斤的液壓油方可啟動(dòng)使用。但當(dāng)氣溫降低時(shí)液壓油濃度大,機(jī)內(nèi)的濾清器不能起到過濾作用,這時(shí)必須將濾清器拆出,待溫度恢復(fù)后,方可生新安裝使用。(注:濾清器應(yīng)每月清洗1-2次)。
溢流筏-控制該機(jī)的壓力開關(guān),旋轉(zhuǎn)調(diào)壓手轉(zhuǎn)向右轉(zhuǎn)為增壓,向左轉(zhuǎn)為減壓,出廠前已調(diào)整好壓力。但在使用過程中調(diào)壓手輪可能有變位現(xiàn)象,導(dǎo)致壓力升高或降低,這時(shí)需要生新調(diào)節(jié)壓力,調(diào)壓時(shí)應(yīng)在運(yùn)轉(zhuǎn)中進(jìn)行,同時(shí)把壓板降至*低位置,調(diào)整溢流筏的調(diào)壓手輪,調(diào)整壓力不能高于或低于壓力表所示的范圍,*佳壓力的OMPA(100KG/1cm2)。旁桿-增強(qiáng)壓的剛性和起導(dǎo)向作用,每次使用前應(yīng)加油,起潤(rùn)滑作用。
行程開關(guān)-控制該機(jī)的啟動(dòng)和停止的作用,因此要經(jīng)常檢查、維修、保養(yǎng)。手動(dòng)轉(zhuǎn)向閥-控制壓板向上向下,停止的開關(guān)。
1、手動(dòng)轉(zhuǎn)向閥打向下檔位時(shí)壓板自動(dòng)向下工作,當(dāng)廢紙壓到結(jié)實(shí)狀態(tài)時(shí),那阻力大于壓力:壓板不能再向下壓,應(yīng)把手動(dòng)轉(zhuǎn)向閥打向空檔位置,停止加壓,如果長(zhǎng)期處于加壓狀態(tài),會(huì)導(dǎo)致液壓,電機(jī)、油泵長(zhǎng)時(shí)間處于超負(fù)荷狀態(tài)而使各機(jī)件損壞。
2、手動(dòng)轉(zhuǎn)向閥打向升檔位置,壓板自動(dòng)向上升到*高的位置,由行程開關(guān)控制自停,這時(shí)應(yīng)把手動(dòng)轉(zhuǎn)向空檔位置。完成一個(gè)工作程序。
液壓打包機(jī)使用說明書:
一、150噸液壓打包機(jī)安裝步驟
1、本機(jī)必須平穩(wěn)放在混凝土上,基礎(chǔ)視當(dāng)?shù)厍闆r決定。
2、檢查油箱底部放油口是否已關(guān)閉,確定關(guān)閉后再打開油箱頂部加油口密封蓋。
注入約90KG,68#液壓油,液壓油排號(hào)視當(dāng)?shù)貧鉁丶笆褂脴?biāo)準(zhǔn)決定。[注!如果機(jī)型在60T以上,新機(jī)時(shí)必須分兩次注油,**次注入液壓油高度至油尺頂部(藍(lán)**線)。待壓板下壓至底部再加注液壓油至油尺底部(紅**線)詳細(xì)見操作說明4]
3、安裝好本機(jī)電源線,電壓及頻率視當(dāng)?shù)仉娫礇Q定,(注!電機(jī)和電器配件的電壓及頻率已按客戶訂購機(jī)器時(shí)的要求配置安裝好)常規(guī)采用三相四線制,其中三條帶電源線分別接入電相內(nèi)相應(yīng)的三個(gè)接線位,(圖7左)另一條為接地防漏電保護(hù)線,應(yīng)緊接機(jī)體外露金屬表面,以防電器漏電傷人。
二、150噸液壓打包機(jī)操作方法:
1、通入電源:把電箱內(nèi)空氣開關(guān)(本機(jī)總開關(guān))合上,先檢查三相電源電壓是否正常,(用儀表或探電筆測(cè)試)關(guān)閉電相門,查看電相門板表面紅色電源指示燈是否亮起。
2、啟動(dòng)電機(jī):把手動(dòng)換向閥手柄(付圖3)往下推至*底位(機(jī)體附有操作圖標(biāo)),然后把啟動(dòng)按鈕NO按下(圖5右下),(注:如裝有急停開關(guān)機(jī)型的請(qǐng)把急停開關(guān)按箭頭方向右旋,急停開關(guān)彈出即可),(圖5右上)如正常情況下電機(jī)啟動(dòng)。
3、 檢看電機(jī)轉(zhuǎn)向:(圖8)電機(jī)啟動(dòng)后,手動(dòng)換向閥手柄在*下位時(shí),如壓板不能往下移。這時(shí)請(qǐng)必須立即查看電機(jī)旋轉(zhuǎn)方向是否正確,電機(jī)旋轉(zhuǎn)方向必須按箭頭指示方向一致。如果電機(jī)轉(zhuǎn)向相反時(shí)則機(jī)器不能正常使用,這時(shí)應(yīng)把手動(dòng)換向閥手柄往上拉至中檔位。然后按下停止按鈕OFF(或急停開關(guān)按下)停止電機(jī)運(yùn)轉(zhuǎn)。切斷輸入總電源,把三相電源線其中二相線互換再接上即可。再按操作1和2重新操作,(注!必須確定電機(jī)轉(zhuǎn)向是否與箭頭指示方向一致。)
4、注入油量的關(guān)?。寒?dāng)壓板正常往下移時(shí),壓板在**次移動(dòng),移動(dòng)速度是不均勻的。待壓板移至底部或移動(dòng)中突然停止又或移動(dòng)中噪聲加大,這種情況下應(yīng)先把手動(dòng)換向閥手柄往上拉至中位,把停止開關(guān)OFF或急停開關(guān)按下,停止電機(jī)運(yùn)行。再仔細(xì)查看油箱儲(chǔ)油量是否足夠,如油量底于油箱高度一半時(shí),證明油量不足,這時(shí)應(yīng)再次往油箱注入適當(dāng)液壓油。這次加油量應(yīng)加至油位尺*底界線(紅**線)即可。150噸液壓打包機(jī)操作方便, 接上電源后打包 , 專用于一切輕泡、松散物料的打包。可應(yīng)用于棉、羊毛、廢紙、廢紙箱、廢紙板、紗線、塑料、布匹、編織袋、針織絨、麻、麻袋、毛條、毛球、繭、蠶絲、啤酒花、麥柴、草、廢塑料袋等一切輕泡、松散物料。包型緊湊,整齊美觀,可大幅降低運(yùn)輸成本,是棉產(chǎn)區(qū)、紡織企業(yè)、超市、服裝廠、廢舊物資回收業(yè)和其他各種輕工業(yè)企業(yè)的生產(chǎn)工具 。
150 tons of vertical hydraulic balers
Scrap balers,
Equipped with power: 15KW,
Taiwan when the output: 3-5 mass,
Package weight: 200-800KG,
Cylinder: Φ160 * 2,
Easy to operate,
Connected to the power after packaging, dedicated to all light foam, loose material packaging. It can be used in cotton, wool, waste paper, waste paper box, waste paperboard, yarn, plastic, cloth, woven bag, knitted cashmere, hemp, sack, top, hair ball, cocoon, silk, hops, , Waste plastic bags and all the light foam, loose material. It is a necessary production tool for cotton producing areas, textile enterprises, supermarkets, garment factories, waste materials recycling industry and other light industrial enterprises.
150 tons of double cylinder hydraulic balers
Model: 150
Nominal pressure master cylinder KN: 1500
Liquid maximum working pressure MPa: 18
Box size 1100mm long, width 700mm, height: 1400mm
Bulk size: Length 1100mm * Width: 700 * Height: (1000) mm
Mass density kg / m3: ≥ 1000
Single cycle time S: 45
Motor power KW: 15
Cylinder travel: 1200MM
Machine dimensions mm: length 1700 * wide 1400 * high 3900.
Machine weight kg; 5500.
Instructions for use:
The factory is equipped with 68 # hydraulic oil, connected to the power supply three-phase 380V, rated current of 25A, the installation should be ground protection, the motor should be operated in accordance with the direction shown to be activated, or can not start. The tank to join the 150 kg of hydraulic oil can be used to start. But when the temperature drops when the hydraulic oil concentration, the machine can not play a filter filter, then the filter must be removed until the temperature is restored before the new installation and use. (Note: the filter should be cleaned 1-2 times per month).
Overflow raft - control the machine's pressure switch, rotary pressure hand turn right to pressurized, turn left to decompression, the factory has been adjusted before the pressure. But in the course of the use of pressure handwheel may have a displacement phenomenon, resulting in increased or decreased pressure, then need to add a new regulation of pressure, pressure should be carried out in the operation, while the pressure plate to the lowest position, adjust the overflow Rafts of the pressure regulating handwheel, the adjustment pressure can not be higher or lower than the pressure gauge shown in the range of optimum pressure for OMPA (100KG / 1cm2). Side bar - to enhance the rigidity of the pressure and play a role, each should be used before the fuel, from the lubrication.
Stroke switch - to control the machine's start and stop the role, so often check, repair, maintenance. Manual steering valve - control the pressure plate up and down, stop the switch.
1, manual steering valve to play down when the pressure plate automatically down work, when the waste paper to a strong state, that resistance is greater than the pressure: the pressure plate can not be pressed down, the manual steering valve should be turned to neutral position, stop Pressurized, if the long-term pressure state, will lead to hydraulic, motor, pump for a long time in a state of overload and damage to the parts.
2, manual steering valve to the upshift position, the platen automatically rose to the highest position, controlled by the trip switch from the stop, then the manual should be turned to the neutral position. Complete a working procedure.
Hydraulic baler instructions:
First, the installation steps
1, the machine must be placed on the concrete, the basic depending on the local situation.
2, check the bottom of the fuel tank is closed, to determine the closure and then open the top of the tank filling port seal.
Injection of about 90KG, 68 # hydraulic oil, hydraulic oil row number as the local temperature and the use of standards. [Note! If the model is above 60T, the new machine must be filled with oil twice, the first time into the hydraulic oil height to the top of the dipstick (blue line). Press the press down to the bottom and then add the hydraulic oil to the bottom of the dipstick (red border) see the operating instructions in detail 4]
3, the installation of the local power cord, voltage and frequency depending on the local power supply decision, (Note! Motor and electrical parts of the voltage and frequency of customer orders have been ordered to install the machine installed) conventional three-phase four-wire system, three With the power cord, respectively, into the electrical phase of the corresponding three wiring bits (Figure 7 left) and the other for the ground leakage protection line, should be exposed to the body exposed metal surface to prevent electrical leakage wounding.
Second, the operation method:
1, access to power: the air box inside the air switch (the main switch) to close, first check the three-phase power supply voltage is normal, (with a meter or probe pen test) to close the electrical phase door, see the power of the door surface red power Whether the indicator light is on.
2, start the motor: the manual valve handle (pay Figure 3) down to the bottom (the body with the operation icon), and then press the button NO button (Figure 5 lower right), (Note: if installed There are emergency stop switch models, please put the emergency stop switch in the direction of the arrow, the emergency stop switch can pop up), (Figure 5 on the right) as normal under the motor start.
3, check the motor steering: (Figure 8) After the motor starts, manual valve handle in the lowest position, such as the pressure plate can not move down. In this case, you must immediately check whether the direction of rotation of the motor is correct and the direction of rotation of the motor must be in the direction indicated by the arrow. If the motor turns to the opposite when the machine can not be used normally, then the manual valve handle should be pulled up to the mid-range position. Then press the stop button OFF (or the emergency stop switch is pressed) to stop the motor from running. Cut off the total input power, the three-phase power cord which can be connected to the two-phase line. And then press operations 1 and 2 to re-operate, (Note! Must determine whether the motor steering direction is consistent with the arrow.)
4, into the fuel of the key: When the pressure plate down the normal move, the pressure plate in the first move, the movement speed is not uniform. To be pressed to move to the bottom or move suddenly stop or move the noise increases, in which case the manual valve should be pulled up to the middle of the handle, stop the switch OFF or emergency stop switch, stop the motor run. And then carefully check the tank oil storage is sufficient, such as oil at the end of the fuel tank height of half, to prove that the amount of oil, then again should be injected into the tank appropriate hydraulic oil. The amount of fuel should be added to the bottom line of the oil level (red line) can be.
您感興趣的產(chǎn)品PRODUCTS YOU ARE INTERESTED IN
商鋪:http://www.yixinui.com/st2544/
主營(yíng)產(chǎn)品:吸料機(jī);上料機(jī);抽料機(jī);送料機(jī);模溫機(jī);冷水機(jī);干燥機(jī);碎料機(jī);冷水塔;液壓打包機(jī);攪拌機(jī);脫水機(jī);干衣機(jī);洗衣機(jī)
環(huán)保在線 設(shè)計(jì)制作,未經(jīng)允許翻錄必究 .? ? ?
請(qǐng)輸入賬號(hào)
請(qǐng)輸入密碼
請(qǐng)輸驗(yàn)證碼
請(qǐng)輸入你感興趣的產(chǎn)品
請(qǐng)簡(jiǎn)單描述您的需求
請(qǐng)選擇省份
聯(lián)系方式
東莞市大田塑膠機(jī)械廠