当着夫的面被夫上司玩弄,最近免费中文字幕中文高清百度 ,超碰CAOPORON入口,精品国产日韩一区二区三区

行業(yè)產(chǎn)品

  • 行業(yè)產(chǎn)品

上海榮計(jì)達(dá)儀器科技有限公司


當(dāng)前位置:上海榮計(jì)達(dá)儀器科技有限公司>>公路土工試驗(yàn)儀器>>多功能電動(dòng)擊實(shí)儀

多功能電動(dòng)擊實(shí)儀

返回列表頁(yè)
參  考  價(jià)面議
具體成交價(jià)以合同協(xié)議為準(zhǔn)

產(chǎn)品型號(hào)JZ-2D

品       牌

廠商性質(zhì)其他

所  在  地

聯(lián)系方式:王林查看聯(lián)系方式

更新時(shí)間:2023-03-30 10:03:05瀏覽次數(shù):146次

聯(lián)系我時(shí),請(qǐng)告知來自 環(huán)保在線

經(jīng)營(yíng)模式:其他

商鋪產(chǎn)品:254條

所在地區(qū):

聯(lián)系人:王林

產(chǎn)品簡(jiǎn)介

多功能電動(dòng)擊實(shí)儀具有輕型擊實(shí)和重型擊實(shí)功能,適用于試驗(yàn)室和現(xiàn)場(chǎng)土工試驗(yàn)用。適用于公路、鐵路、水利、建筑地基填土工程設(shè)計(jì),以標(biāo)準(zhǔn)擊實(shí)方法在一定的擊實(shí)功下,測(cè)定土的含水量與干密度之關(guān)系,以確定該土的A佳含水量與相應(yīng)的A大干密度。借以了解土的壓實(shí)性能作為工地土基壓實(shí)控制的依據(jù)。

詳細(xì)介紹

多功能電動(dòng)擊實(shí)儀具有輕型擊實(shí)和重型擊實(shí)功能,適用于試驗(yàn)室和現(xiàn)場(chǎng)土工試驗(yàn)用。適用于公路、鐵路、水利、建筑地基填土工程設(shè)計(jì),以標(biāo)準(zhǔn)擊實(shí)方法在一定的擊實(shí)功下,測(cè)定土的含水量與干密度之關(guān)系。

The multifunctional electric compactor has light compaction and heavy compaction functions, and is suitable for laboratory and field geotechnical tests. It is suitable for highway, railway, water conservancy, and construction foundation filling engineering design. The standard compaction method is used to determine the relationship between soil moisture content and dry density under a certain compaction work.


多功能電動(dòng)擊實(shí)儀符合(GB-7960/87)標(biāo)準(zhǔn),是根據(jù)頒發(fā)的公路試驗(yàn)行業(yè)標(biāo)準(zhǔn)(T0131-93)研制的機(jī)電一體化儀器,其結(jié)構(gòu)性能符合承載比試驗(yàn)(CBR)(T0134-93),回彈模量試驗(yàn)(T0135-93)中的擊實(shí)試驗(yàn)試件制作要求。

The multifunctional electric compactor complies with the (GB-7960 / 87) standard. It is a mechatronics instrument developed in accordance with the Highway Test Industry Standard (T0131-93) issued by the Ministry of Communications. T0134-93), requirements for making compaction test specimens in rebound modulus test (T0135-93).


多功能電動(dòng)擊實(shí)儀技術(shù)指標(biāo):

★重型擊實(shí)試驗(yàn):

部標(biāo):錘重4.5千克;落錘高度450毫米 

國(guó)標(biāo):錘重4.5千克;落錘高度457毫米

★輕型擊實(shí)試驗(yàn):

部標(biāo): 錘重2.5千克;落錘高度300毫米 

國(guó)標(biāo): 錘重2.5千克;落錘高度305毫米

適用試模筒直徑:

部標(biāo): Φ100毫米;Φ152毫米 

國(guó)標(biāo): Φ102毫米;Φ152毫米

★錘頭直徑:

部標(biāo):Φ50毫米 

國(guó)標(biāo):Φ51毫米

錘擊速度:30次/分

電機(jī)規(guī)格:380伏;550瓦;1400轉(zhuǎn)/分

Technical indicators of multifunctional electric compactor:

★ Heavy compaction test:

Ministry standard: hammer weight 4.5 kg; drop weight height 450 mm

National standard: hammer weight 4.5 kg; drop weight height 457 mm

★ Light compaction test:

Ministry standard: Weight of 2.5 kg; drop weight height of 300 mm

National standard: hammer weight 2.5 kg; drop weight height 305 mm

Applicable test tube diameter:

Ministry standard: Φ100mm; Φ152mm

National standard: Φ102 mm; Φ152 mm

★ Hammer diameter:

Ministry standard: Φ50 mm50

National standard: Φ51 mm

Hammering speed: 30 times / minute

Motor specifications: 380 volts; 550 watts; 1400 rpm


多功能電動(dòng)擊實(shí)儀操作規(guī)程:

★根據(jù)使用試筒的直徑大小,調(diào)整好工作臺(tái)的位置,開機(jī)前先用人工提放一下?lián)魧?shí)錘,確認(rèn)試模邊緣不受擊實(shí)為準(zhǔn)。

★取制備好的土樣分3-5次倒入筒內(nèi)。小筒按三層法時(shí),每次約800-900g;按五層法時(shí),每層需試樣約400-500g。大筒使用時(shí),應(yīng)先將墊塊放入筒內(nèi)底板上,按五層法時(shí),每層需試樣約900-1100g;按三層法時(shí),每層需試樣約1700g左右。整平表面,并稍加壓緊,然后按規(guī)定的擊實(shí)數(shù)進(jìn)行置數(shù)并啟動(dòng)進(jìn)行擊實(shí)。擊實(shí)時(shí)擊實(shí)錘應(yīng)自由垂直落下,錘跡必然均勻分布于土樣面,層擊實(shí)完后,將試樣層面“拉毛",然后按“復(fù)位"鍵,重復(fù)上述方法進(jìn)行其余各層土的擊實(shí)。

★擊實(shí)完成后,用修土刀沿套筒內(nèi)壁削刮,使試樣與套筒脫離后,扭動(dòng)并取下套筒,齊筒頂細(xì)心削平試樣,擦凈筒外壁,稱量。用脫模器進(jìn)行脫模,從試樣中處取樣測(cè)其含水量。

★注意使用小筒擊實(shí)之前,上下插好擊實(shí)頭插桿;使用大筒擊實(shí)之前,拔除上下插桿。

Multifunctional electric compactor operating procedures:

★ Adjust the position of the worktable according to the diameter of the test cylinder. Before starting, manually lift the compaction hammer to confirm that the edge of the test mold is not compacted.

★ Take the prepared soil sample and pour it into the tube in 3-5 times. When the small tube is in the three-layer method, it is about 800-900g each time; in the five-layer method, the sample is about 400-500g in each layer. When using the large cylinder, the spacer should be placed on the bottom plate of the cylinder first. According to the five-layer method, each layer needs about 900-1100g of samples; when the three-layer method is used, each layer needs about 1700g. Level the surface, apply a little pressure, and then set it according to the specified number of compactions and start compaction. The real-time compaction hammer should fall freely and vertically, and the hammer marks must be evenly distributed on the soil sample surface. After the layer compaction is completed, the sample layer is "pulled", and then the "reset" key is repeated. Compact.

★ After the compaction is completed, scrape along the inner wall of the sleeve with a trowel to detach the sample from the sleeve, twist and remove the sleeve, carefully flatten the sample with the top of the cylinder, wipe the outer wall of the cylinder, and weigh. Use a demoulder to demold, and take a sample from the sample to measure its water content.

★ Pay attention to inserting the plug of the compaction head up and down before using the small tube;


多功能電動(dòng)擊實(shí)儀調(diào)試:

★將本機(jī)放置在平整的水泥地面上。

★將主機(jī)上伸出的導(dǎo)線接到控制器后面板的輸出端。(10芯)

★將電源線接到控制器后面板的輸入端。(4芯)

★將電源線插頭插上電源上。

★按下控制器上的置數(shù)/啟動(dòng)鈕,使之處于置數(shù)狀態(tài)。

★撥動(dòng)置數(shù)盤,使之為03。

★按下電源開/關(guān)鈕,電源接通。

★按置數(shù)/啟動(dòng)鈕,使之彈起,機(jī)器開始運(yùn)轉(zhuǎn)。

★待自動(dòng)停機(jī)后,若擊實(shí)錘被提起,則接線正確,可正常工作;若擊實(shí)錘落在試筒內(nèi),則電機(jī)是反轉(zhuǎn),應(yīng)將電源插頭的任意兩根火線調(diào)換位置,再次試機(jī),直到自動(dòng)停機(jī)后擊實(shí)錘處于提起位置。

Multifunctional electric compactor debugging:

★ Place the machine on a flat concrete floor.

★ Connect the wires protruding from the host to the output of the rear panel of the controller. (10 cores)

★ Connect the power cord to the input terminal on the rear panel of the controller. (4 cores)

★ Plug the power cord into the power supply.

★ Press the setting / start button on the controller to make it set.

★ Set the dial to 03.

★ Press the power on / off button to turn on the power.

★ Press the setting / start button to make it pop up and the machine will start to run.

★ After the machine stops automatically, if the hammer is lifted, the wiring is correct and it can work normally; if the hammer is dropped in the test cylinder, the motor is reversed, and any two live wires of the power plug should be replaced. Test the machine until the hammer is in the raised position after automatic shutdown.


其他推薦產(chǎn)品更多>>

感興趣的產(chǎn)品PRODUCTS YOU ARE INTERESTED IN

環(huán)保在線 設(shè)計(jì)制作,未經(jīng)允許翻錄必究 .? ? ? Copyright(C)?2021 http://www.yixinui.com,All rights reserved.

以上信息由企業(yè)自行提供,信息內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由相關(guān)企業(yè)負(fù)責(zé),環(huán)保在線對(duì)此不承擔(dān)任何保證責(zé)任。 溫馨提示:為規(guī)避購(gòu)買風(fēng)險(xiǎn),建議您在購(gòu)買產(chǎn)品前務(wù)必確認(rèn)供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。

會(huì)員登錄

×

請(qǐng)輸入賬號(hào)

請(qǐng)輸入密碼

=

請(qǐng)輸驗(yàn)證碼

收藏該商鋪

請(qǐng) 登錄 后再收藏

提示

您的留言已提交成功!我們將在第一時(shí)間回復(fù)您~
会宁县| 买车| 托里县| 河东区| 哈密市| 韶山市| 永济市| 莱州市| 桃园市| 遂川县| 中山市| 马公市| 依兰县| 益阳市| 天峨县| 城口县| 双牌县| 饶平县| 冷水江市| 遂平县| 揭西县| 鹤山市| 沁阳市| 京山县| 赞皇县| 张掖市| 枣庄市| 玉田县| 宝鸡市| 丰城市| 托里县| 大英县| 阿拉善盟| 泾川县| 东阳市| 通化县| 奉节县| 屏东县| 扬州市| 富顺县| 潮州市|